SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2016012050,Midpeninsula Regional Open Space District,,,Monte Bello Open Space Preserve Bridge Projects,NOD,3/11/2016,3/11/2016,"The District has identified two creek crossing locations (Sites 1 and 2) along the Stevens Creek Nature Trail alignment in need of retrofitting. Site #1 is the location of an existing 24 ft long wooden beam bridge on an unnamed tributary to Stevens Creek. Stevens Creek Nature Trail in this area is multi-use, but can be closed to cyclists and equestrians. Channel incision and bank erosion underneath the bridge threaten its integrity, making it vulnerable to damage and/or failure during large storm events. Site #2 is an existing at-grade wet ford across the mainstem of Stevens Creek, upstream of the general vicinity of Site #1. Stevens Creek Natural Trail in this location is currently open only to pedestrians. The proposed project includes bridge construction activities at Sites 1 and 2. Work at Site #1 would replace the existing 24 ft long wooden beam bridge across Tributary Creek with a new 45- to 50-ft long steel bridge that is farther from the actively eroding creek banks. Work at site #2 would replace an existing at-grade wet ford crossing of the Stevens Creek mainstem with a new 45- to 50-ft long steel bridge to improve safety and avoid sensitive creek and riparian habitats. ",https://ceqanet.opr.ca.gov/2016012050/2,Monte Bello Open Space Preserve Bridge Projects,Bryan Apple,Midpeninsula Regional Open Space District,N/A,,330 Distel Circle,,Los Altos,CA,94022,6506911200,37°19'1.1"N 122°10'20.6"W,Palo Alto,Santa Clara,,At two creek crossings along the Stevens Creek Nature Trail,94022,<1,35106025,35,"Stevens Creek (SC), tributary creek to SC, & 8 others",,,,,,,,,,,,,Midpeninsula Regional Open Space District ,Yes,3/9/2016,No,No,Yes,,Yes,,No,Yes,"330 Distel Dr, Los Altos, CA 94022"