SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2015122019,"Cloverdale, City of",City of Cloverdale,,Porterfield Creek Open Space Trails (Lake or Streambed Alteration Agreement No. 1600-2017-0417-R3),NOD,11/6/2017,11/6/2017,"CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0417-R3, pursuant to section 1602 of the Fish and Game Code to the project applicant, City of Cloverday. The current project is limited to installing a new footbridge across South Branch Porterfield Creek. The proposed bridge will be a single span and fiberglass with dimensions of 5 feet by 50 feet. Bridge pieces will be transported up existing trails via ATV, then walked to the crossing location and assembled on site. Bridge footings will be 6 feet wide by 1 foot thick by 2 feet deep. The footings will be placed approx. 18 feet from top of bank on the left bank and approx. 15 feet away from top of the right bank looking downstream. The footings will be made from concrete that will be poured in place. The bridge will allow for a wet creek crossing to be decommissioned. All work will be conducted outside of the stream channel. ",https://ceqanet.opr.ca.gov/2015122019/2,Clover Springs Open Space Preserve Project,Karen Weiss,CDFW,N/A,,7329 Silverado Trail,,Napa,CA,94558,7079445525,,Cloverdale,Sonoma,,West of the terminus of Skyview Drive,95425,,Various,US 101,Porterfield Creek,Cloverdale Municipal,,,,,,,,,,,,CDFW ,No,10/31/2017,No,No,Yes,,No,,No,No,"7329 Silverado Trail, Napa, CA 94558"