SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2015102089,Placer County Water Agency,,,Long Ravine Pipeline Replacement Project,NOD,7/8/2016,7/8/2016,"Placer County Water Agency (PCWA) is proposing to construct the Long Ravine Pipeline Replacement Project. The purpose of the proposed project is to increase the operational efficiency and reduce the maintenance challenges associated with the Long Ravine Pipeline. The pipeline was installed in the early 1900s and because of the pipeline's age and condition, and the undesirable operating characteristics of the pipeline, it has been determined it needs to be replaced. The proposed project involve installing a new 30-inch, 4,900 ft. long conveyance pipeline. In addition to installing the new pipeline, the project includes replacing the existing intake structure on the Boardman Canal, construction of a new flow control facility, installation of a new 24-inch pipeline between the new flow control facility and Colfax Header Box, improvements to the Boardman Canal spillway, construction of two new access roads, and demolition activities.",https://ceqanet.opr.ca.gov/2015102089/3,Long Ravine Pipeline Replacement Project,Ken Powers,Placer County Water Agency,N/A,,PO Box 6570,,Auburn,CA,95604,5308234886,,Colfax,Placer,,Norton Grade Road and Rollins Lake Road,,,,I-80,No,No,,,,,,,,,,,,PLacer County Water Agency ,Yes,7/7/2016,No,No,Yes,,Yes,,No,No,"144 Ferguson Road, Auburn, CA 95603"