SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2015102029,Trinity County,,,Coffee Creek Road and Ramshorn Road Bridge Replacements Project,NOD,11/24/2015,11/24/2015,"Trinity County, in Cooperation with the Federal Highway Administration (FHWA) Central Federal Lands Highway Division, is proposing to replace three existing bridges: 5C-048 over Coffee Creek on Coffee Road, 5C-196 over Adams Creek on Coffee Creek Road and 5C-061 over Mumbo Creek on Ramshorn Road. New bridges would improve public safety for traffic crossing Adams Creek, Coffee Creek, and Mumbo Creek by replacing functionally obsolete and/or structurally deficient bridges with new one lane structures that meet current design standards. To meet design standards, each proposed bridge structure would be 20 ft wide, consisting of one 16-ft travel lane and two 2-ft railings. The structure design for each bridge would accommodate a 50-yr flood event with 2 ft of freeboard; i.e., the low-beam elevation for the new structure would be at least 2 ft higher than the 50-yr flood elevation. Minor approach work totaling no more than 350 ft from each end of the bridge abutments is anticipated, with the potential for improvements to enhance curvature and sight distance. Aggregate would be placed on the roadways.",https://ceqanet.opr.ca.gov/2015102029/2,Coffee Creek Rd @ Coffee & Adams Creeks & Ramshorn Rd @ Mumbo Creek Bridge Replacements,Janice Smith,Trinity County,N/A,,P.O. Box 2490,,Weaverville,CA,96093,530-623-1365 x3405,41°7'6"N 122°53'40"W,,Trinity,,State Highway 3; Coffee Creek Road; Ramshorn Road,96041,3,004-150-11 & 003-320-03,Hwy 3,"Coffee Creek, Trinity River, Mumbo Creek",,,,,,,,,,,,,Trinity County ,Yes,11/19/2015,No,No,Yes,,Yes,,No,,"PO Box 2490, 31301 State Highway 3, Weaverville, CA 96093"