SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2015102005,Humboldt County,,,Pena Water Diversion and Crossing Project (Lake or Streambed Alteration Agreement No. 1600-2017-0673-R1),NOD,3/1/2018,3/1/2018,"Project is limited to 9 encroachments. One encroachment is to upgrade an undersized crossing from an 18 inch to a 30 inch diameter. A second encroachment is to upgrade an undersized culvert from an 18 inch to a 30 inch diameter. A third encroachment is to improve low water crossing on a class III watercourse to a rocked ford. A fourth encroachment is to improve a functioning and appropriately sized 18 inch culvert by rocking the ford. A fifth encroachment is to decommissioning an undersized and nonfunctioning 6-inch culvert. A sixth encroachment is to decommission a low water crossing on a class II watercourse. A seventh encroachment is for water diversion from unnamed class III intermittent spring tributary to South Fork Eel River. Water is diverted for household domestic and cannabis cultivation use from a cistern to storage. An eighth encroachment is to decommission two watercourse crossings, a road segment and two graded flats. A ninth encroachment is to remediate a water storage site b armoring the cut slope with rip rap, armoring ditch relief channel with rip-rap and installing native vegetation along ditch relief and in proximity to a class II watercourse. Work for the water diversion and stream crossings will include use and maintenance of the infrastructure.",https://ceqanet.opr.ca.gov/2015102005/52,Water Diversion Removal (Lake or Streambed Alteration Agreement No. EPIMS-HUM-36939-R1C),Angela Liebenberg,CDFW,N/A,,619 Second St.,,Eureka,CA,95501,7079644830,,,Humboldt,,,,,,,,,,,,,,,,,,,,CDFW ,No,2/16/2018,No,No,Yes,,Yes,,No,No,"619 Second St., Eureka, CA 95501"