SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2015082021,Tahoe City Public Utility District,,,West Tahoe Regional Water Treatment Plant Project,NOD,3/17/2021,3/17/2021,"The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The State Water Board’s Drinking Water State Revolving Fund (SRF) Program is financing the Project. The Tahoe City Public Utilities District is proposing to construct a new West Lake Tahoe Regional Water Treatment Plant (WLTRWTP) to address water supply issues for the McKinney-Quail Water Service Area, and to provide a regional drinking water supply solution for the west shore area of Lake Tahoe. The WLTRWTP components include installation of two intake pumps with a power line that runs between intake pumps and the electrical/chemical feed room, replacement of the existing intake pipeline with a pipeline from the intake facilities to the WLTRWTP, construction of an intake pump station and chemical feed room, and construction of a water treatment facility. Construction activities also include decommission and removal of the existing interim surface water treatment plant, lake intake pump station, and concrete vault.",https://ceqanet.opr.ca.gov/2015082021/5,West Lake Tahoe Regional Water Treatment Plant,Gabriel Edwards,State Water Resources Control Board,N/A,gabriel.edwards@waterboards.ca.gov,1001 I Street,16th Floor,Sacramento,CA,95814,9164495990,39°4'21"N 120°8'41"W,,Placer,Placer,Lodge Drive between Flicker Avenue and SR 89,96142,6.5,098-330-004,Hwy 89,"McKinney Creek, Lake Tahoe, Quail Crk, General Crk",,,,,,,,,,,,,State Water Resources Control Board,No,3/16/2021,No,No,Yes,,Yes,Yes,No,No,http://www.tahoecitypud.com/