SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2015078043,California State Lands Commission,,,Amendment of Lease - PRC 4909.1,NOE,7/1/2015,7/1/2015,"Authorize the amendment of Lease No. PRC 4909.1, a Non-Commercial Lease, effective May 1, 2015, to replace two existing floating docks with two larger floating docks and increase the swim area.",https://ceqanet.opr.ca.gov/2015078043,Amendment of Lease - PRC 4909.1,Beverly Terry,California State Lands Commission,N/A,,"100 Howe Avenue, Suite 100-South",,Sacramento,CA,95825-8202,9165741900,,Truckee,Nevada,,,,,,,,,,,,,,,,,Categorical Exemption,"Class 2, New Construction of","Cont: Small Structures; 15061 CCR; Section 2905 (c)(1) Title 2; DIV 3 Amendment for the above-mentioned structure(s) will cause only a minor physical change in the environment and will not change existing activities in the area. There are no unusual circumstances surrounding the project that will result in significant environmental impacts. Therefore, the project will not have a significant effect on the environment and the above categorical exemption(s) apply(ies).",,,,,,,,,,,,