SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2015068188,Fish & Wildlife 1 (Redding),"California Department of Fish and Wildlife, Region 1",CDFW,"Issuance of aStreambed Alteration Agreement No. 1600-2015-0069-R1, Channel Realignment for Septic Setback",NOE,6/15/2015,6/15/2015,"Project is limited to realigning approx. 400 linear feet of stream channel in order to meet necessary setbacks for a septic system installation for a new single family modular home. The stream is an ephemeral tributary to Salmon Creek, and primarily exists within this reach as a vegetated channel, with very little rock substrate, so impacts are mostly limited to downstream sediment delivery. The project will be completed when there is no standing water in the channel and soil substrate is dry. The realignment must consider all range of flows so that new channel can adequately handle the capacity of the former channel and must be set at a grade where downcutting will not occur from changing the stream profile. The new alignment will cut off a meander bend, so the new bank must have protective rock rip-rap installed to prevent channel recapture at the point where the new channel moves away from the old channel. Disturbed areas will be seeded with native grass seed.",https://ceqanet.opr.ca.gov/2015068188,"Issuance of aStreambed Alteration Agreement No. 1600-2015-0069-R1, Channel Realignment for Septic Setback",Kate Grossman,"California Department of Fish and Wildlife, Region 1",N/A,,Northern Region,601 Locust Street,Redding,CA,96001,5302252239,,,Shasta,,,,,,,,,,,,,,,,,Categorical Exemption,"S:15303, class 3",New Construction or Conversion.,,,,,,,,,,,,