SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2015052056,"Calistoga, City of",City of Calistoga,,Berry Street Bridge Replacement Project,NOD,8/20/2015,8/20/2015,"The Berry Street Bridge Replacement Project includes replacing the existing Berry Street Bridge that crosses the Napa River, widening the bridge approaches, and realign the intersection of Berry Street and Washington Street. The Proposed Project includes the construction of an approximately 80-foot long and 55-foot wide single-span bridge. New abutments would also be installed farther up the channel bank to improve the hydraulic conveyance capacity at the bridge site. The intersection improvements include 93 feet to the west and 80 feet to the east on Washington Street. Berry Street will have a light horizontal curve through the bridge, which will shorten the bridge span. This alignment will require a small right-of-way acquisition from the City owned parcel at the southeast corner of the Berry Street/Washington Street intersection.",https://ceqanet.opr.ca.gov/2015052056/2,Berry Street Bridge Replacement Project,Mike Kirn,City of Calistoga,N/A,,414 Washington Street,,Calistoga City,CA,94515,7079422828,38°34'47.29"N 122°34'56.32"W,Calistoga,Napa,,Berry Street and Washington Street,94515,,,Hwy 29,Napa River,,,,,,,,,,,,,City of Calistoga ,Yes,8/12/2015,No,No,Yes,,Yes,,,Yes,"City of Calistoga, 414 Washington St, Calistoga, CA 95415"