SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2015052041,Contra Costa County,,,Alhambra Valley Road Safety Improvements (at Rancho La Boca Road and Ferndale Road),NOD,6/17/2015,6/17/2015,"Alhambra Valley Road is a rural road with winding turns and poor sight distance in some locations. The project consists of widening two segments; at Rancho La Boca Road (Site 1) and just west of Ferndale Road (Site 2). The purpose of the project is to minimize the potential for injuries from vehicles running off the road. The improvements will also allow for bicyclists to ride outside of the main travel way. The project will improve these segments by providing paved shoulders and removing or relocating roadway obstacles, including utility poles, guardrails, trees, and landscaping, to provide a clear recovery zone for vehicles; roadway flashers will be installed in both directions at both sites. Cut and fill earthwork will be required to accommodate these proposed improvements and to improve sight distance at Site 1. Drainage improvements include installation of storm drain inlets and associated pipe connections, and installation of concrete headwalls and rock slope protection at an existing culvert at Site 2. Disturbed areas will be stabilized as necessary following construction. Construction activities will be generally limited to the hours between 7:00 a.m. to 5:00 p.m.; noise-generating activities will be limited to 8:00 a.m. to 5:00 p.m. Construction of the project will require either one-way traffic control for 4 weeks or a 2-week full road closure from just west of Ferndale Road to west of Rancho La Boca Road. Mail notifications will be sent to surrounding property owners prior to start of construction implementation of road closure, if needed. In addition, detour route signs will be posted seven days prior to start of construction at various locations in the project vicinity; emergency vehicles will have access at all times. Proposed right-of-way acquisitions will consist of silver portions (varying between 5 and 30 feet) along the frontages of several residential properties to accommodate the widening. Permanent drainage and utility easements, and temporary construction easements will also be needed. Construction of the project is anticipated to start sometime between April and October in 2016 and take approximately three months to complete.",https://ceqanet.opr.ca.gov/2015052041/2,Alhambra Valley Road Safety Improvements (at Rancho La Boca Road and Ferndale Road),Claudia Gemberling,Contra Costa County,N/A,,30 Muir Road,,Martinez,CA,94553,9253132192,37°58'7"N 122°10'35"W,Martinez,Contra Costa,,Rancho La Boca Road and Ferndale Road,94553,1.6,,,Unnamed tributary to Alhambra Del Hambre,,,,,,,,,,,,,Contra Costa County ,Yes,6/16/2015,No,No,Yes,,Yes,,No,Yes,"Contra Costa County, 255 Glacier Drive, Martinez, CA 94553"