SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2015042002,"Santa Cruz, City of",City of Santa Cruz,,Temporary Outlet Channel - San Lorenzo Lagoon Interim Management Plan Project,NOD,8/19/2015,8/19/2015,"The project is limited to the following activities: construction of a temporary lagoon breach outlet channel through the sandbar of the San Lorenzo River Lagoon to reduce water surface elevation (WSE) in the lagoon when it measures above five ft National Geodetic Vertical Datum (NGVD); WSE reduction to between four to three ft NGVD dependent upon environmental conditions at the time of breach channel outlet construction; and closure of the temporary breach outlet channel. Elevation measurements will be taken at the train trestle bridge staff plate located adjacent to the Santa Cruz Beach Boardwalk. The project will minimize impacts to fisheries resources by maintaining a stable outlet channel during the breach, avoiding a sudden decrease in WSE and preventing WSE from lowering less than 3 ft NGVD. Project activities may be repeated up to six times from May 1 to November 15 in the years of 2015 to 2016. The extent of the project area is from the mouth of the San Lorenzo River to above Water Street Bridge (approximately 1.5 miles in length) and into the lower Branciforte Flood Control Channel, while associated construction activities will take place at the sandbar of the San Lorenzo River Lagoon no further than 500 ft from the Pacific Ocean. The CDFW is executing a lake and streambed alteration agreement no. 1600-2015-0175-R3 pursuant to section 1602 of the fish and game code to the project applicant, Scott Collins, City of Santa Cruz.",https://ceqanet.opr.ca.gov/2015042002/3,San Lorenzo River Lagoon Interim Management Program,Melissa Farinha,CDFW Bay Delta Region,N/A,,7329 Silverado Trail,,Napa,CA,94558,7079445579,,Santa Cruz,Santa Cruz,,East Cliff Drive,,,"007-321-04, -07, -09, 007-291-01",Hwy 1,San Lorenzo River and Monterey Bay,,,,,,,,,,,,,CDFW ,No,8/17/2015,No,No,Yes,,,,,,"CDFW Bay Delta Region, 7329 Silverado Trail, Napa, CA 94558"