SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2015038237,"Forestry and Fire Protection, Department of",California Department of Forestry and Fire Protection,CAL FIRE,Fire Preparedness Exercise 2015,NOE,3/25/2015,3/25/2015,"The Fire Preparedness Exercise (FPE) requires CAL FIRE San Bernardino Unit personnel to demonstrate physical fitness and the safe and effective use of fire suppression tactics in preparation for 2015 peak staffing level. The FPE will be located on land owned by the City of Industry. The total project area is approx. 50 acres; however, not all this area will be impacted by project activities. Approx. 10 acres will receive treatment for this training, 40 acres will remain undisturbed. The FPE will consist of 20 handlines (approx. 6 feet wide) constructed by CAL FIRE Type I hand crews on brush covered hillsides. The crews will utilize chainsaws to cut shrubs, and hand tools to remove surface vegetation exposing bare mineral soil (approx. 2 feet wide). No trees will be cut during these exercises. no burning of the slash will occur. There are no watercourses within the project area. Fire crews will hike on an existing trail prior to beginning the handline construction. Engine crews may conduct progressive hose lays which will not involve the cutting of vegetation and will be done on existing roads and disturbed areas. Fire apparatus shall be operated from existing roads and road shoulders to pump water for the progressive hose lay. No heavy equipment will be operated off existing road surfaces or disturbed road shoulders.",https://ceqanet.opr.ca.gov/2015038237,Fire Preparedness Exercise 2015,Henry Herrera,Cal Fire,N/A,,3800 N. Sierra Way,,San Bernardino,CA,92405,9094758091,,Chino Hills,"Los Angeles, San Bernardino",,,,,,,,,,,,,,,,,Categorical Exemption,"S:15304, Class 4",Minor Alterations to Land.,,,,,,,,,,,,