SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2015038074,"Mount Shasta, City of",City of Mount Shasta,,Water Supply Line Replacement Project,NOE,3/11/2015,3/11/2015,"As proposed, the subject project consistsof the installation of approximately 9,500 feet of new 12-inch PVC water main line. Of this amount, approximately 8,700 feet will be installed within the existing public right-of-way of McCloud Road between Adams Drive and the City's Tank No. 4 located near the Cold Springs water supply. The pipeline will generally be installed within the gravel shoulder and within three feet of the edge of pavement of the existing road. However, short portions of the proposed pipeline will be installed within the existing asphalt concrete paving. Quail Hill Tanks Supply Pipeline - In order to increase the hydraulic capacity of the supply pipeline to and from the Quail Hill Tanks, it will be necessary to install approximately 900 feet of new parallel 12-inch supply pipeline from Quail HIll Drive to the City's existing Quail HIll Tanks.",https://ceqanet.opr.ca.gov/2015038074,Water Supply Line Replacement Project,Paul Eckert,City of Mount Shasta,N/A,,305 N. Mount Shasta Boulevard,,Mount Shasta,CA,96067,5309267510,,Mount Shasta,Siskiyou,,,,,,,,,,,,,,,,,Categorical Exemption,"15301(b), 02(c), 03(d), 04(f)",Both the McCloud Road Pipeline and the Quail Hill Pipelines protions of teh project are consistent with the intent of Sections 15301(b); 15302(c); 15303(d); and 15304(f) of the Public Resources Code as the project involves work to enhance an existing publicly owned municipal utility (water) system and in furtherance of codified law of the State Water Code.,,,,,,,,,,,,