SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2015031030,Pixley Irrigation District,,,Deer Creek Channel Clearing and Maintenance Project,MND,3/9/2015,,"The proposed project objectives are to maintain the Deer Creek Channel as an effective conveyance of irrigation water. This will require periodic maintenance of existing structures as well as the beds and banks of the channel. Specific maintenance projects for the study have not yet been identified at this time, however the proposed maintenance activities expected to be covered under the SAA include repair and maintenance of approximately 70 features (bridges, dams, pipes, weirs, and/or turnouts) at approximately 22 locations within the bed and bank of the Deer Creek Channel or turnout channel immediately adjacent to the creek. Activities would occur both above and below ordinary high water. Other maintenance activities could include the control of vegetation within the Deer Creek Channel and the removal of accumulated sediment at selected features within the channel.",https://ceqanet.opr.ca.gov/2015031030,Deer Creek Channel Clearing and Maintenance Project,Dan Vink,Pixley Irrigation District,N/A,,357 E. Olive Avenue,,Tipton,CA,93272,5596864716,35°59'0"N 119°6'0"W,,Tulare,,"South of Avenue 116, East of Road 140, West of Road 152, North of Avenue 108",,20 linear miles,,"Hwy 99, 43",Deer Creek Channel,,No,3/9/2015,4/7/2015,Other,,"Biological Resources, Cultural Resources",,,,,,,,,,,,,,,,,