SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2015021003,"Army Corps of Engineers, United States","United States Army, Army Corps of Engineers",USACE,Santa Ana River Mainstem: Reach 9 BNSF Railroad Bridge Protection,ADM,4/18/2017,,"Note: Review per lead The U.S. Army Corps of Engineers proposes minor changes to the BNSF bridge protection features that were approved for construction in 2015. Approx 2.29 acres of permanent impacts and 7.13 acres of temporary impacts are expected to be added to the BNSF bridge protection project footprint. An update to the EA and EIR is required to address this expanded permanent project footprint (minor expansion of the bridge piers and abutment wall), modifications to the temporary construction/staging work areas on both the east and west side of the Santa Ana River, re-alignment of a permanent maintenance access road closer to the Green River Mobile Home Park, and design refinements to accommodate additional project features, such as the addition of permanent survey monuments. ",https://ceqanet.opr.ca.gov/2015021003/4,Santa Ana River Mainstem: Reach 9 BNSF Railroad Bridge Protection,Priyo Majumdar,U.S. Army Corps of Engineers,N/A,,"915 Wilshire Boulevard, Ste 930",,Los Angeles,CA,90017,2134523861,33°52'36.1"N 117°40'4.04"W,Corona,"Orange, Riverside",,Green River Rd and Green River Golf Club Rd,92880,35.36,,"91, 71",Santa Ana River,,No,4/18/2017,5/12/2017,Other,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Economics/Jobs, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Public Services, Recreation, Transportation, Vegetation, Wetland/Riparian",,,,,,,,,,,,,,,,,