SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2014128021,"Toxic Substances Control, Department of",Department of Toxic Substances Control,,Approval of the Removal Action Work Plan for Garden Valley Site,NOE,12/2/2014,12/2/2014,"DTSC pursuant to authority Chapter 6.8 of the Health and Safety Code, Section 25300 et seq approved the Removal Action Work Plan (RAW) as submitted by TRC Solutions, Inc. for the Garden Valley Site (Site) on July 10, 2014 on behalf of Callan Properties and KB Home. The purpose of the project is to remediate the Site to conditions allowing for residential land use development and to minimize human exposure to impacted soil that exceeds residential cleanup goal. The RAW focuses on excavating approximately 1,194 cubic yards of lead-contaminated soil and offsite soil disposal to an appropriately permitted disposal facility. Confirmation sampling will be conducted to verify achievement of the lead cleanup goal. The excavations will be backfilled with clean uncontaminated soil approved by DTSC. Project activities are scheduled to commence in Jan 2015 and is projected to be completed in six months.",https://ceqanet.opr.ca.gov/2014128021,Approval of the Removal Action Work Plan for Garden Valley Site,Remedios V. Sunga,Department of Toxic Substances Control,N/A,,700 Heinz Avenue,,Berkeley,CA,94710,5105403840,,Daly City,San Mateo,,,,,,,,,,,,,,,,,Categorical Exemption,"S:15330, Class 30","Minor actions to prevent, minimize, stabilize, mitigate or eliminate the release or threat of release of hazardous waste or hazardous substances.",,,,,,,,,,,,