SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2014122065,"Public Utilities Commission, California",California Public Utilities Commission,CPUC,Missouri Flat-Gold Hill 115 kV Power Line Reconductoring Project (A. 13-08-014),FIN,3/20/2015,,"FYI Final PG&E, in its California Public Utilities Commission application (A. 13-08-014) filed on August 13, 2013, requests a Permit to Construct the proposed project, which includes: reconductoring 12.5 miles of Missouri Flat 115 kV power line; replacement of 61 existing tubular steel poles (TSPs) with new TSPs; undergrounding of 1,000 feet of existing 21 kV overhead distribution line; modification of 13 lattice steel towers; reconductoring 7 miles of Gold Hill No. 1 60 kV power line; replacement of 80 existing wood poles with new wood or light-duty steel poles; relocation of 150 feet of existing distribution feeder line; and modification to existing substations and switching stations. All construction would occur in El Dorado County and the City of Folsom, in Sacramento County.",https://ceqanet.opr.ca.gov/2014122065/2,Missouri Flat-Gold Hill 115 kV Power Line Reconductoring Project (A. 13-08-014),Connie Chen,California Public Utilities Commission,N/A,,505 Van Ness Avenue,,San Francisco,CA,94102-3298,4157032168,,Folsom,"El Dorado, Sacramento",,Several,Multiple,,Several,Hwy 50,Multiple,Cameron Airpark,No,,,Power,,"Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,