SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2014111062,Madera County,,,Road 23 Bridge Replacement at Dry Creek,MND,11/21/2014,,"The existing concrete deck bridge on steel girders, pier, and abutments will be removed and replaced with a 43-foot wide by 80-foot long, precast concrete deck structure, supported by concrete abutments with precast concrete piles on either side of the creekbed. The project will require only minor modifications to the horizontal or vertical alignment of the existing roadway. The bridge will conform to the existing approach road width. No center support within the creekbed or any additional travel lanes will be included. The road will be closed during construction and traffic detour routes will be identified in the Project's Traffic Control Plan. The project footprint will be within the existing County right-of-way and will not require acquisition of additional ROW.",https://ceqanet.opr.ca.gov/2014111062,Road 23 Bridge Replacement at Dry Creek,Larry Tonel,Madera County,N/A,,200 West Fourth Street,,Madera,CA,93637,5594455286,,Madera,Madera,,"West of SR 99, approximately 0.5 miles south of Avenue 18 1/2",,,,Hwy 99,Dry Creek,No,No,11/21/2014,12/22/2014,Transportation,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,