SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2014102006,"Vallejo, City of",City of Vallejo,,Monticello Water Main Replacement Project - Phase 2,MND,10/3/2014,,"Note: Shorten Review To avert a critical water delivery shortage, the City of Vallejo (City) proposes to replace the existing 24-inch water pipeline from SR 12 to the Cordelia Reservoir Complex with a new 42-inch water pipeline in order to increase the capacity of the Lake Berryessa water delivery system. The majority of the proposed pipeline alignment would be located within an existing City easement, with the exception of the segment to be relocated down Red Top Road to facilitate crossing of Highway 80. In addition to the pipeline replacement/installation, other proposed improvements would include: a revised inter-tie with the existing intake pipeline to the City Reservoir at the Cordelia Reservoir Complex and upgrades to the Emergency Pump Station.",https://ceqanet.opr.ca.gov/2014102006,Monticello Water Main Replacement Project - Phase 2,Franz Nestierode,City of Vallejo Water Division,N/A,,202 Fleming Hill Road,,Vallejo,CA,94589,7076484308,38°12'25.2"N 122°9'23.4"W,"Fairfield, Vallejo",Solano,,"SR 12, Red Top Road, McGary Road",,,,Hwy 12,Jameson Canyon Creek; Cordelia Slough,,No,10/3/2014,10/22/2014,Water Facilities,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,