SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2014101018,Riverside County Transportation Commission,,RCTC,Squaw Mountain Road Bridge Repair Project,NOD,8/20/2015,8/20/2015,"The Squaw Mountain Road Bridge Repair Project includes repair of the bridge by lining the channel bottom below the bridge with concrete, connecting the concrete-lined channel to the existing bridge abutments, placing 1/4 ton of riprap on the upstream and downstream sides of the concrete-lined portion of the channel and installing riprap slope protection on the northwest slope. An existing asphalt access road will also be extended approximately 40 ft. There is also a side tributary to Coldwater Wash that was previously realigned for the Painted Hills Development Project and was intended to flow adjacent to Squaw Mountain Road before entering the wash. As a result of significant degradation of the channel wash, the side channel has head cut back from the wash and is now eroding into the slope of Squaw Mountain Road and needs to be stabilized. The proposed repairs would consist of regrading the upper portion of the channel to the appropriate elevation, leaving this portion of the channel as a natural drainage. Flow would be directed to a basin before entering into a pipe that would outlet at the base of the slope in Coldwater Wash. ",https://ceqanet.opr.ca.gov/2014101018/2,Squaw Mountain Road Bridge Repair Project,Russell Williams,Riverside County,N/A,,"4080 Lemon St, 8th Floor",,Riverside,CA,92501,9519551646,33°46'6"N 117°29'10"W,Corona,Riverside,,Squaw Mountain Road and Temescal Canyon Road,92883,.94,290-050-030; 290-190-028 and 047,I-15,"Temescal Wash, Coldwater Wash",,,,,,,,,,,,,Riverside County ,Yes,8/18/2015,No,No,Yes,,,,,,"4080 Lemon St, 8th Floor, CA 92501"