SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2014098145,Fish & Wildlife 3 (Napa),"California Department of Fish and Wildlife, Region 3",CDFW,Sanders Ranch Culvert Replacements,NOE,9/9/2014,9/9/2014,"The Project is limited to the insertion of a 125 foot long culvert into a previously existing, approximately 4 foot diamter culvert. Rock and grouting will first be removed and the new culvert inserted into the old one. The new culvert will be slightly smaller than the existing culvert and a gunite based material will be injected into the space in between the larger and smaller culverts and allowed to harden at both Project locations.",https://ceqanet.opr.ca.gov/2014098145,Sanders Ranch Culvert Replacements,Robert Stanley,"California Department of Fish and Wildlife, Region 3",N/A,,7329 Silverado Trail,,Napa,CA,94558,7079445573,,San Ramon,Contra Costa,,,,,,,,,,,,,,,,,Categorical Exemption,15302 - Class 2,Replacemetn and reconstruction of two existing structures where the new structure will be located on the same site as the structure being replaced and will have substantially the same purpose and capacity as the structure being replaced.,,,,,,,,,,,,