SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2014092051,State Water Resources Control Board,,,Vaca Dixon - Lakeville 230 kV Reconductoring Project,MND,9/16/2014,,"PG&E is proposing to replace and upgrade 40 miles of conductors on a two-circuit, 230 kilovolt transmission line that runs between Vaca Dixon Substation in Vacaville and Lakeville Substation near Petaluma, in order to maintain service reliability and meet increasing electric load demands. The project primarily spans rural residential and agricultural areas. The project includes modifications to approximately 189 existing towers along the line and to equipment o Vaca Dixon, Tulacay, and Lakeville Substations to accept the new conductors. Approximately 39 cage top extensions of the towers will be installed along the transmission line, and one tubular steel pole within the Tulacay Substation. The project would take approximately 16 to 24 months to complete. Construction is expected to begin in summer of 2015, with an energization date in December 2017.",https://ceqanet.opr.ca.gov/2014092051,Vaca Dixon - Lakeville 230 kV Reconductoring Project,Joanna Jensen,State Water Resources Control Board,N/A,,"1001 I Street, 15th Floor",,Sacramento,CA,95814,9163415587,38°24'6.6"N 121°55'16.2"W,"Napa, Petaluma, Sonoma, Vacaville","Napa, Solano, Sonoma",,Various,Various,506.61,0133-060-070,"Hwy 116, 121, 12, and 29",33 plus associated tributaries,5,No,9/16/2014,10/15/2014,Other,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,