SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2014091017,Washington Unified School District,,,Washington Union School District Water System Improvement Project,NOD,5/9/2016,5/9/2016,"SWRCB is a responsible agency for this project. The SWRCB's Safe Drinking Water State Revolving Fund Program is providing funds for the project. The Washington Unified School District proposes to construct and develop a new well and install water supply pipelines connecting Washington Union HS and Washington Colony School. A new well will be constructed on the southeast corner of Lincoln Avenue and Clara Avenue located within a Washington Unified School District-owned parcel. A distribution pipeline and fire hydrants will be constructed within the County of Fresno existing roads rights-of-way. The pipeline will travel west along Lincoln Ave. and north along Clara Ave. to tie in to the new stadium distribution system, east along Lincoln Ave. to connect with the Washington Colony School well, and south along Elm Avenue where it will terminate at Larson Ave. Improvements to existing Washington Union High School facilities will be completed within the school property. The capacity of the Washington Colony School well will be increased by installing a new pump along with upgraded controls.",https://ceqanet.opr.ca.gov/2014091017/3,Water System Improvement Project,Tyler Hunt,SWRCB,N/A,,"1001 I Street, 17th Floor",,Sacramento,CA,95814,8059385364,36°38'55.57"N 119°47'27.59"W,Fresno,Fresno,,"Lincoln Ave/Clara Ave, and Elm Ave and Larson Ave",93706,,,SR 99 and 41,,,,,,,,,,,,,,SWRCB ,No,5/6/2016,No,No,Yes,,Yes,,No,Yes,"1001 I Street, 17th Floor, Sacramento, CA 95814"