SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2014082053,"Toxic Substances Control, Department of",Department of Toxic Substances Control,,"Interim Measures Work Plan, Tesla Motors, Inc. Factory",NOD,9/23/2014,9/23/2014,"The Department of Toxic Substances Control (DTSC) is approving an Interim Measures Work Plan (IMW) for the Tesla Facility/Former New United Motor Manufacturing, Inc. (NUMMI) site (hereinafter ""the Site"") located at 45500 Fremont Blvd., Fremont, California, pursuant to authority granted under California Health & Safety Code, Division 20, Chapter 6.5. DTSC is overseeing investigation and cleanup at the Site under a Corrective Action Consent Agreement (CACA) (Docket No. HWCA P2-13/14-001) with Tesla and NUMMI. The IMW was submitted on September 22, 2014 by The Source Group Inc (SGI) on behalf of NUMMI. The purpose of the IMW is to prevent or minimize exposures to chemicals of concern (COCs) from known contaminated source areas in soil and groundwater and prevent migration of COCs from source areas to underlying groundwater. The interim removal action proposed for the Site consists of the following activities: excavation and off-site disposal of approximately 14,585 cubic yards (""yd3"") of lead, total petroleum hydrocarbon (TPH), benzene, toluene, ethylbenzene, and xylenes (BTEX), and naphthalene contaminated soil from two areas, the Former Fuel Dispenser Island and Former Tank Farm Area (hereinafter the ""Project Area""); soil will be transported off-site to approved Class I or Class II Landfills; excavation area groundwater will be removed and treated using granular activated carbon prior to discharge under permit to the Union Sanitation District (""USD""), the local Publically Owned Treatment Works ""POTW""); after completion of removal activities, excavation areas will be backfilled with approximately 3,167 yd3 clean crushed rock and 20,622 yd3 clean fill soil from local sources. After backfilling, concrete and asphalt barriers will be installed to return the surface of the Project Area to its current covered condition. Groundwater monitoring wells that are within the excavation footprint will be destroyed and reinstalled after the Project Area is restored. The project activities are expected to be completed in approximately 100 days. This Interim Measure is not a final remedy. The final remedy for the Site will be identified in the Corrective Measures Study for the Site, which will be prepared after implementation of the IMW and after investigation of the Site is complete. The final remedy may include placement of a land use covenant on all or a portion of the Site and operation and maintenance requirements.",https://ceqanet.opr.ca.gov/2014082053/2,"Interim Measures Work Plan, Tesla Motors, Inc. Factory",Homayune Atigee,Department of Toxic Substances Control,N/A,,700 Heinz Avenue,,Berkeley,CA,94710,5105403838,37°29'36"N 121°56'27"W,Fremont,Alameda,,Fremont Blvd and Industrial Drive,94538,211,519-1747-11,"Hwy 680, 880, 238, 262",Agua Caliente Creek,,,,,,,,,,,,,DTSC ,Yes,9/23/2014,No,No,Yes,,No,,No,No,"Fremon Main Library, 2400 Stevenson Blvd, Fremont, CA 94538 or DTSC Berkeley Regional Office File Room, 700 Heinz Avenue, Berkeley, CA 94710"