SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2014071005,"Conservation, Department of",California Department of Conservation,DOC,Super Creek Quarry Expansion Revised BLM Plan of Operations and Amended Reclamation Plan No. 137,MND,7/1/2014,,"The proposed project on BLM land would involve implementation of a reclamation plan for an expansion of an existing decorative rock quarry operation that would add approximately 33.4 acres to the active quarry site and an additional 21 acres along the west and south boundaries that would remain undisturbed. It would include mining two small hilltops, development of two new waste placement areas, and additional sediment basins and drainage controls. Reclamation would consist of final grading and revegetation. The methods of extraction and processing would not change compared to current quarry operations. No expansion of annual production is proposed, and there would be no change in the amount of material hauled off-site to the retail facility. The projected life of mining operations is 25 years.",https://ceqanet.opr.ca.gov/2014071005,Super Creek Quarry Expansion Revised BLM Plan of Operations and Amended Reclamation Plan No. 137,Will Arcand,Department of Conservation State Mining and Geology Board,N/A,,"801 K Street, Suite 2015",,Sacramento,CA,95814,9163221082,33°57'0"N 116°38'24"W,,Riverside,,Whitewater Cutoff,95672,105.2,514-260-012,"Hwy 62, 111; I-10","Super Creek, Whitewater River",No,No,7/1/2014,7/30/2014,Mining,,"Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian",,,,,,,,,,,,,,,,,