SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2014068528,San Diego Unified Port District,,,General Dynamics NASSCO Paint Cell 5 Building Expansion,NOE,6/30/2014,6/30/2014,"a The proposed project involves a 3,515-square-foot expansion of paint cell 5 to support General Dynamics NASSCO's (NASSCO) existing ship building and repair operations. NASSCO currently operates a shipbuilding and repair facility on the eastern shoreline of San Diego Bay in the City of San Diego. NASSCO's facility includes a blast and paint facility comprised of two blast cells and five paint cells that allow for painting within the facility during inclement weather. The blast and paint facility also captures and destroys volatile organic compounds associated with NASSCO's operations in order to reduce air emissions and improve overall air quality. Paint cell 5 currently measures 69,200 sq. ft. and is located at the southeastern end of the blast and paint facility. The proposed building expansion will occur at the rear end of paint cell 5, which is currently paved and used for internal roadway circulation. The purpose of the proposed project is to maximize the production output of paint cell 5, which will increase the efficiency of shipbuilding activities and capture air emissions associated with NASSCO's existing operation. Work to complete the proposed project will include the following: -Demolition of approximately 3,44 sq. ft. of existing asphalt cover and utility piping on the project site; -Shallow grading to a depth of approximately 1.5 feet to prepare the site for the concrete pad; -Construction of an approximately 3,444 sq. ft. reinforced concrete pad to support the building expansion; -Installation of utility piping and electrical conduits for building expansion; -Construction of the approximately 3,515 sq. ft. paint cell 5 building expansion, including support and equipment, and -Realignment of an internal roadway to the southeast to accommodate the proposed building expansion. Existing utilities that currently serve NASSCO's facility include potable water, wastewater, natural gas, and electricity. The proposed project will include an extension of the existing utilities in order to serve the proposed expansion. Existing electrical capacity at NASSCO's facility is anticipated to be sufficient to support the proposed project. Therefore, upgrades to the existing transformer station are not proposed. ",https://ceqanet.opr.ca.gov/2014068528,General Dynamics NASSCO Paint Cell 5 Building Expansion,Mayra Medel,San Diego Unified Port District,N/A,,3165 Pacific Highway,,San Diego,CA,92101,6196866598,,San Diego,San Diego,,,,,,,,,,,,,,,,,Categorical Exemption,"S:15301, Class 1",Existing Facilities.,,,,,,,,,,,,