SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2014061045,Eastern Municipal Water District,,EMWD,"Salt Creek Regional Sewer Project - 1627' Pressure Zone, 1719' PZ Phase I Water Infrastructure and Recycled Water Pipelines",NOD,8/13/2014,8/13/2014,"Eastern Municipal Water District (District) proposes to construct and operate a new sewer located directly south of Salt Creek along the Riverside County Flood Control maintenance road. The purpose of the project is to build the infrastructure necessary to support approved land uses in and around the Winchester Hills Specific Plan (No. 293). See Figure 3 - Proposed Facilities. The new sewer includes the installation of approximately 10,300 linear feet of pipeline ranging from 15-inch diameter to 21-inch diameter. The project would be constructed at a depth of approximately 15 feet, within existing rights-of-way and along the Riverside County Flood Control maintenance road. The proposed project also considers the construction of approximately 8,700 linear feet of 18-inch diameter water pipeline to server the 1627 pressure zone; approximately 10,200 linear feet of water pipeline ranging from 18-inch diameter to 36-inch diameter to serve the 1719 pressure zone; and approximately 23,000 linear feet of 18-inch recycled water pipeline to be installed along Olive Avenue and Domenigoni Parkway.",https://ceqanet.opr.ca.gov/2014061045/2,Salt Creek Regional Sewer Project including 1627 PZ & 1719 PZ Water Infrastructure and Recycled Water Pipe,Helen Stratton,Eastern Municipal Water District,N/A,,2270 Trumble Road,P.O. Box 8300,Perris,CA,92572-8300,(951) 928-3777 x4545,,,Riverside,,RCFC Maintenance Road between La Ventana Road and Rice Road,92596,,,Hwy 79,Salt Creek,,,,,,,,,,,,,Eastern Municipal Water District ,,8/6/2014,No,No,Yes,,Yes,,No,No,"Eastern Municipal Water District 2270 Trumble Road Perris, CA 92570"