SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2014058050,Energy Commission,California Energy Commission,,Fuel Cell Hybrid Electric Walk-In Van Deployment Project,NOE,5/5/2014,5/5/2014,"The Center for Transportation and the Environment along with its partners, will develop, validate, and deploy fuel cell hybrid electric walk-in delivery vans. The project will help eliminate criteria pollutant, green house gas emissions, and eliminate PM2.5 emissions completely and are projected to eliminate 884,000 gallon of diesel.",https://ceqanet.opr.ca.gov/2014058050,Fuel Cell Hybrid Electric Walk-In Van Deployment Project,,California Energy Commission,N/A,,"1516 Ninth Street, MS-48",,Sacramento,CA,95814,9166545000,,Stockton,San Joaquin,,,,,,,,,,,,,,,,,Categorical Exemption,"S:15301, Class 1",The proposed work will be done within an existing operational facility. The vehicles will be built at the site of an existing facility that is fully developed and is consistent with the facility's capabilities and no modification to the facility is required. this can not possibly have a significant effect on the environment and is therefore exempt under the categorical exemption for existing facilities.,,,,,,,,,,,,