SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2014052039,Sonoma Marin Area Rail Transit Commission,,,Mira Monte Marsh Restoration Project,MND,5/13/2014,,"The project site consists of two separate parcels, a 27.13-acre parcel in Sonoma County, which includes 2.59 acres of tidal channel, and a 35.03-acre parcel in Marin County, separated by San Antonio Creek, which feeds into the Petaluma River just east of the project site. The Sonoma County parcel, located on the north side of San Antonio Creek, is undeveloped wetlands and only accessible by crossing San Antonio Creek or the adjacent property, north of the site. The Marin County parcel, located on the south side of the creek, is partially developed with a marina, recreational vehicle (RV)/boat storage facility, and two residences. The project proposes to remove all existing structures to restore the site to its historic natural ecosystem. The project would re-establish 8.08 acres, rehabilitate 4.55 acres, and preserve 42.19 acres of tidal marsh.",https://ceqanet.opr.ca.gov/2014052039,Mira Monte Marsh Restoration Project,Hamid Shamsapour,Sonoma Marin Area Rail Transit Commission,N/A,,"5401 Old Redwood Highway, Suite 200",,Petaluma,CA,94954,7077943330,38°9'23.58"N 122°33'9.68"W,Novato,"Marin, Sonoma",,8934 Redwood Highway,94945,62.16,"125-160-14, 019-370-004",,San Antonio Creek and Petaluma River,Gnoss Field,Yes,5/13/2014,6/11/2014,,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,