SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2014051033,"Fresno, City of",City of Fresno,,Orange Center School District Water Consolidation Project,MND,5/8/2014,,"The City is proposing to construct, operate, and maintain approximately 2.8 miles of new water mains (pipelines) with associated connections to existing pipelines, tees, valves, and fire hydrants within the City of Fresno and unincorporated Fresno County. The City plans to construct 3,300 feet of 14-inch water main in S. Cherry Avenue from the current terminus of its water main, which is in the vicinity of Fresno Irrigation District (FID) North Central No. 26 canal, southward to the intersection with E. Central Avenue; 3,300 feet of 14-inch water main in S. East Avenue, from the current terminus of its water main, in the vicinity of FID's North Central No. 26 canal, southward to the intersection with E. Central Avenue; and 8,000 feet of 16-inch water main in E. Central Avenue from the intersection of S. Cherry Avenue eastward to connect with the City's existing water main in S. Cedar Avenue. Installation of these water pipelines would allow the Orange Center Elementary School to connect to the City of Fresno water system, allowing the school to replace its current use of bottled water and to cease using its on-site well (which would be abandoned). The project would also complete infrastructure improvements to ensure water system reliability and water service for properties along S. Cherry Avenue, E. Central Avenue, and S. East Avenue within the City's service area.",https://ceqanet.opr.ca.gov/2014051033,Orange Center School District Water Consolidation Project,Sandra Brock,City of Fresno,N/A,,1910 E. University Avenue,,Fresno,CA,93703,5596218041,,Fresno,Fresno,,South Cherry Avenue / East Central Aveneue / South East Avenue,93706,,,"SR 99, 41","North Central Canal, South Central Canal, Colony Canal",No,No,5/8/2014,6/6/2014,Other,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Wildlife",,,,,,,,,,,,,,,,,