SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2014051008,Orange County,,,Santa Ana River Parkway Extension Project,NOD,11/29/2016,11/29/2016,"The proposed project includes the construction of a new Class I Bikeway, Riding and Hiking Trail, and associated amenities on the north and south banks of the Santa Ana River, between Gypsum Canyon Road Bridge and the Orange County boundary. A new Riding and Hiking Trail (approximately 1.75 miles) would be located parallel to the existing SAR Class I Bikeway that is located on the southern bank of the SAR, adjacent to SR-91. A new parallel Class I Bikeway and Riding and Hiking Trail would extend through a portion of the existing Green River Golf Course toward the BNSF Railroad, where the alignment would then follow the BNSF Railroad eastward to the Orange/San Bernardino County boundary. This new parallel Class I Bikeway and Riding and Hiking rail would start approx. 0.15 mile upstream from the Coal Canyon off-ramp in Chino Hills State Park. Additionally, a new parallel Class I Bikeway and Riding and Hiking trail would extend eastward from Gypsum Canyon Road Bridge on the northern bank of the SAR, adjacent to LA Palma Avenue. Three bridges (narrow/non-vehicular) will be constructed. Two of those bridges will cross the Santa Ana River and will connect the new Class I Bikeway, the new Riding and Hiking Trail, and the existing SAR Class I Bikeway. The proposed project will include other design features such as a staging area, trailheads, turnouts, and vista points.",https://ceqanet.opr.ca.gov/2014051008/3,Santa Ana River Parkway Extension Project,Jeff Dickman,Orange County Public Works,N/A,,300 N. Flower Street,,Santa Ana,CA,92703,7146473937,33°52'29"N 117°41'49"W,Yorba Linda,Orange,,La Palma Avenue / Gypsum Canyon Road,92887,420,Various,"Hwy 241, 91, 71",Santa Ana River,No,,,,,,,,,,,,County of Orange ,Yes,11/22/2016,Yes,Yes,No,,Yes,,Yes,Yes,"300 Norht Flower Street, Santa Ana, CA 92703"