SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2014048104,Caltrans 6 (Fresno),"California Department of Transportation, District 6",,State Route 58 Median K-rail and Ramp Friction Surface,NOE,4/11/2014,4/11/2014,"The project involves installation of two runs of temporary concrete barrier (K-rail) within the separation median, approximately 600-ft each with crash cushion endings, approximately 345-ft east of Real Road (PM R52.20) to the beginning of the SR-58/99 separation (PM R52.33) at the SR-58-99 interchange. And, install a layer of High Friction Surfacing, approximately 12,500-ft2, to the SR-58/99 SB connector ramp.",https://ceqanet.opr.ca.gov/2014048104,State Route 58 Median K-rail and Ramp Friction Surface,G. William "Trais" Norris,"California Department of Transportation, District 6",N/A,,"844 M Street, Suite 200",,Fresno,CA,93721,5594456447,,Bakersfield,Kern,,,,,,,,,,,,,,,,,Categorical Exemption,S:21084;14CCR15300,"The project has no effect on the surrounding environment, where the construction consists of placement of K-rail in the median without vegetation removal, and a high friction treatment to the road surface. There are no compensatory mitigation requirements associated with this project.",,,,,,,,,,,,