SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2014042005,Caltrans 4 (Oakland),"California Department of Transportation, District 4",,Highway 1 Cheney Gulch Slope Stabilization,NEG,4/1/2014,,"Repairing the embankment along the southbound Highway 1 at Postmile 7.2. Major elements of the project include: excavating the loose material on the hillside below the highway; protecting the soil surface from erosion by placing rock slope protection fabric; installing rock slope protection; filling voids with native topsoil; applying biodegradable erosion control; and reseeding to restore the original naturalized slope. The proposed project is both within and outside of the existing highway right-of-way. A temporary construction easement, and permanent easement of acquisition, would be required. The construction would take approximately 45 to 60 days. No traffic lanes would be closed during this work.",https://ceqanet.opr.ca.gov/2014042005,Highway 1 Cheney Gulch Slope Stabilization,Michelle Ray,"California Department of Transportation, District 4",N/A,,"855 M Street, Suite 200",,Fresno,CA,93721,5594455386,,,Sonoma,,Highway 1,,,,Hwy 1,Cheney Gulch,,Yes,4/1/2014,4/30/2014,Transportation,,"Aesthetics, Biological Resources, Coastal Zone, Hydrology/Water Quality, Vegetation",,,,,,,,,,,,,,,,,