SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2014031074,San Diego County Water Authority,,,"Mitigated Negative Declaration for the Pipelines 3, 4 and 5 Relining",NOD,5/27/2014,5/27/2014,"The proposed project consists of the installation of welded steel liners in portions of P3, P4, and P5. The P3 relining is proposed for a length of approximately 475 feet, while the project proposes relining longer lengths of P4 and P5, at approximately 3,400 feet each. The relining would be performed underground, within the existing pipelines, but worker and equipment access to the interior of the pipelines requires excavation to establish access portals that are grouped at two locations along the alignment. Other above-ground activities would include worker and equipment access at existing manhole stations and blow-off valve stations along the project alignment, equipment storage, and activity at specified staging areas.",https://ceqanet.opr.ca.gov/2014031074/2,"Pipeline 3, 4, and 5 Relining: San Luis Rey River",Mark Tegio,San Diego County Water Authority,N/A,,"1600 Pacific Highway, Rm. 260 MS A-33",,San Diego,CA,92101,8585226753,,Fallbrook,San Diego,,"SR 76, Dulin Road, Sage Road, Brodea Lane, Mountain View Road",Various,16.5,Various,"SR 76, I-15",San Luis Rey River,No,,,,,,,,,,,,San Diego County Water Authority ,Yes,5/22/2014,No,No,Yes,,Yes,,No,No,"San Diego County Water Authority Administration Building, 4677 Overland Avenue, San Diego, CA 92123."