SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2014028128,"Mammoth Lakes, City of",City of Mammoth Lakes,,District Monument Project,NOE,2/13/2014,2/13/2014,"The project consists of the installation of a district monument on the corner of Main Street and Old Mammoth Road. The district monument shall be placed between the trails system fork, allowing pedestrians either to cross Old Mammoth road to remain parallel with Main Street or to turn right to travel down Old Mammoth Road. The monument shall be placed in existing right-of-way in previously disturbed areas.",https://ceqanet.opr.ca.gov/2014028128,District Monument Project,Jamie Robertson,City of Mammoth Lakes,N/A,,P.O. Box 1609,,Mammoth Lakes,CA,93546,7609348989,,Mammoth Lakes,Mono,,,,,,,,,,,,,,,,,Categorical Exemption,S:15303,"The new construction of a district monument is categorically exempt under New Construction or Conversion of Existing Structures 15303 (e). Construction will occur within the shoulder of pre-existing pedestrian trails and minimally affect the area other than the footing location of the monument final placement; therefore, these follow the criteria of ""construction and location of limited numbers of new, small facilities or structures.""",,,,,,,,,,,,