SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2014021056,Long Beach Unified School District,,,Polytechnic High School Auditorium AB 300 Project,MND,2/24/2014,,"The Proposed Project will consist of the seismic retrofit and upgrades to the existing Auditorium Building and the renovation of the building interior finishes and upgrades to light fixtures and the fire alarm, electrical infrastructure, plumbing, mechanical, and sprinkler systems (see Figure 4, Proposed Project - Site Plan). The primary existing seismic deficiencies are inadequate wall anchorage systems, overstressed concrete wall pilasters at the high roofs due to out-of-plane loads, overstressed roof diaphragms, lack of diaphragm continuity cross ties, and insufficient seismic separation between the Auditorium Building and the adjacent Band Room Building. The proposed seismic retrofit will address these deficiencies. The Proposed Project is expected to occur over a 15-month period, approximately between Fall 2014 and Winter 2015.",https://ceqanet.opr.ca.gov/2014021056,Polytechnic High School Auditorium AB 300 Project,Tom Rizzuti,Long Beach Unified School District,N/A,,2425 Webster Avenue,,Long Beach,CA,90810,5629977553,,Long Beach,Los Angeles,,Atlantic Avenue and E. 15th Street,90813,1,,Hwy 1,,,No,2/24/2014,3/25/2014,Educational,,"Cultural Resources, Hazards & Hazardous Materials",,,,,,,,,,,,,,,,,