SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2013101037,"Torrance, City of",City of Torrance,,SR-1 (PCH) at SR-107 Hawthorne Blvd Intersection Project,NOD,2/14/2014,2/14/2014,"The project includes the addition of a left turn lanes to provide dual left-turn lanes and a right-turn pocket along both the eastbound and westbound no approaches along PCH. To accommodate proposed improvements the length of EB PCH to be widened is approximately 535 feet (ft.), and the length of WB PCH to be widened is approximately 600 ft. On south leg of Hawthorne Boulevard, a NB right turn lane onto EB PCH is proposed. The EB PCH approach is going to be widened from 37 to 65 ft. The EB PCH (east of Hawthorne) would be widened from 37 ft. to 42 ft. The NB Hawthorne approach would be widened from 40 to 52 ft. Additional improvements include striping/signage, traffic signal modification, drainage improvements, utility relocations, and the rehabilitation of the existing pavement. The project also involves the future consideration of the potential acquisition of any right-of-way necessary to install these improvements.",https://ceqanet.opr.ca.gov/2013101037/2,SR-1 (PCH) at SR-107 Hawthorne Blvd Intersection Project,Gregg D. Lodan,City of Torrance,N/A,,3031 Torrance Boulevard,,Torrance,CA,90503,3106185990,33°48'18"N 118°21'3"W,Torrance,Los Angeles,,PCH and Hawthorne,90503,,,"SR-1, 107",,Torrance Municipal,,,,,,,,,,,,City of Torrance ,Yes,2/11/2014,No,No,Yes,,,,,,"City of Torrance Community Development Department 3031 Torrance Boulevard, Torrance CA 90503"