SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2013101028,"Toxic Substances Control, Department of",Department of Toxic Substances Control,,Draft Remedial Action Plan - Former Fresno 1 Manufactured Gas Plant,NOD,12/12/2013,12/12/2013,"The Dept. of Toxic Substances Control (DTSC) has approved a Remedial Action Plan (RAP) pursuant to regulatory authority granted under Chapter 6.8, Division 20, California Health and Safety Code (H&SC) on the PG&E Former Fresno-1 Manufactured Gas Plant (MGP) site located at 211 North Thorne Avenue, Fresno, CA in Fresno County. The RAP will address impacts to soils gases from previous operations on the Site. The remedial activities will involve excavation and disposal at an off-site permitted facility of ~37,400 cubic yards or ~1,400 truckloads (2,800 round trips) of contaminated soils that are highly impacted by polycyclic aromatic hydrocarbons (PAHs), benzene, arsenic, lead, and petroleum hydrocarbons. The remaining soil impacted areas will be capped and land use covenants will be placed upon them. Additionally, there will be ~the same amount of clean backfill imported from a local quarry located in Friant, CA that is ~22.8 miles southeast of the Site. The imported fill will be tested for contaminants in accordance with DTSCs October 2001 Imported Advisory on Clean Fill Material. The remediation activities will occur in three phases, with each phase taking an estimated four to six months to complete. The three phases will start in the year 2015 and end in 2017. ",https://ceqanet.opr.ca.gov/2013101028/2,Draft Remedial Action Plan - Former Fresno 1 Manufactured Gas Plant,Jeff Gymer,Department of Toxic Substances Control,N/A,,1515 Tollhouse Rd,,Clovis,CA,93611,5592973907,36°44'42.34"N 119°48'48.63"W,Fresno,Fresno,,Thorne/Fruit,93706,11.8,"458-04-17, 18, 05",Hwy 99,Herndon Canal,Chandler Airfield,,,,,,,,,,,,DTSC ,Yes,12/9/2013,No,No,Yes,,No,,No,No,"Fresno County Free Library, 2420 Mariposa Street, Fresno, CA 93721 (559) 600-7323 Administrative Record - DTSC File Room, 1515 Tollhouse Road, Clovis, CA 93611 (559) 297-3929"