SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2013091070,"Public Utilities Commission, California",California Public Utilities Commission,CPUC,SDG&E Master Special Use Permit (MSUP) and Permit to Construct (PTC) Power Line Replacement Projects,FIN,3/17/2016,,"FYI Final SDG&E's proposed MSUP/PTC Power Line Replacement Projects would consolidate over 70 existing special use permits for SDG&E facilities within the Cleveland National Forest (CNF) into one MSUP to be issued by the Forest Service. The MSUP would allow the continued operation and maintenance of approximately 102 miles of SDG&E's existing 69 kV transmission line (TL) also referred to as power lines, 12 kV circuits (C) also referred to as distribution lines and ancillary facilities, as well as approximately 34 miles of existing access roads require to maintain and operate SDG&E electric facilities within the CNF. In addition to combining the permits and easements for existing SDG&E facilities within the CNF into one MSUP, SDG&E's proposed project includes the replacement of five existing 69 kV power lines and six 12 kV distribution circuits located within and outside of the CNF, referred to herein as the proposed power line replacement projects. Powerline replacement would primarily include fire hardening (wood-to-steel pole replacement) along with relocation, removal, undergrounding, and single-circuit to double-circuit conversion along certain facilities and segments. The proposed power line replacement projects will require authorization under the MSUP as well as approval form the CA Public Utilities Commission. Approval of the MSUP would allow for the continued operation and maintenance of SDG&E electric facilities within the CNF and authorize the replacement of certain existing power lines on and adjacent to CNF lands. MSUP approval is being requested by SDG&E because the existing authorization within the CNF are expired, and the existing power lines are needed to supply power to local communities, residences, and government-owned facilities located within and adjacent to the CNF. ",https://ceqanet.opr.ca.gov/2013091070/4,SDG&E Master Special Use Permit (MSUP) and Permit to Construct (PTC) Power Line Replacement Projects,Lisa Orsaba,California Public Utilities Commission,N/A,,505 Van Ness Avenue,,San Francisco,CA,94102-3298,4157031966,,Pauma Valley,"Orange, San Diego",,Multiple,,,Multiple,"I-8, SR-76, 78, 79",Various,,No,,,Other,,"Aesthetics, Agriculture and Forestry Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Wildlife",,,,,,,,,,,,,,,,,