SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2013088010,"Regional Water Quality Control Board, Region 5 (Central Valley), Sacramento",,,Cedar Ravine Creek Sewer Main Relocation PRoject,NOE,8/1/2013,8/1/2013,"The Cedar Ravine Sewer Main Relocation Project consists of replacing two abandonded 4-inch and 8-inch diameter sewer pipes approximately 185-feet long and 135-feet long respectively located within Cedar Ravine Creek. A new approximately 60-feet long, 6-inch diameter sewer pipe will be placed in a different location downstream of the exisitng sewer pipes.",https://ceqanet.opr.ca.gov/2013088010,Cedar Ravine Creek Sewer Main Relocation PRoject,Trevor Cleak,"Regional Water Quality Control Board, Region 5 (Central Valley),",N/A,,11020 Sun Center Drive #200,,Rancho Cordova,CA,95670,9162553000,,,El Dorado,,,,,,,,,,,,,,,,,Categorical Exemption,15302,Replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site. as the structure replaced and will have substantially the same purpose and capacity as the structure replaced.,,,,,,,,,,,,