SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2013081079,Kern County,,,PLN21-00298,NOE,6/9/2021,6/9/2021,"California High Speed Rail (CHSR) is constructing the phase 1 of the High-Speed Rail Passenger Service in the Central Valley. Based on our review of CRC’s internal engineering standards, as well as generally accepted industry practices, we have concluded that the minimum allowable distance from the proposed HSR line is 200 feet from CRC’s facilities. Therefore, the three storage tanks and associated auxiliary equipment within this 200-feet zone will need to be relocated. This scope includes the construction of a new tank battery (three, 3,000-barrel tanks) with the same capacity and design basis of the existing CRC Rose Facility located at Wasco, CA. Also, the relocation of the LACT Unit and associated vent stack, and truck loading facility is included. The major equipment included in the relocated facility are the following: • 2 new Oil Storage • 1 new Produced Water Tank • 1 Relocated LACT Unit Charge Pump • 1 Relocated LACT Unit • 1 relocated Vent Stack Truck Loading system • 1 Relocated Truck Loading Skid",https://ceqanet.opr.ca.gov/2013081079/1698,Second Supplemental Recirculated Environmental Impact Report (SSREIR) for Revisions to Title 19- Kern County Zoning Ordinance (2024) focused on oil and gas ,Palmira Hernandez,California Resources Production Corporation,N/A,palmira.hernandez@crc.com,900 Old River Road,,Bakersfield,CA,93311,6613352664,,,Kern,Kern,,,,059-280-578,,,,,,,,,,,,Ministerial,Sec. 21080(b)(1); 15268,"O&G Minor Activity Review are ministerial under Kern County Zoning Ordinance and are exempt under Sections 21080(b)(1) and 15268 of the State CEQA Guidelines",,,,,,,,,,,,