SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2013071001,Carpinteria Sanitary District,,,West Padaro Lane Main Sewer Extension,MND,7/1/2013,,"The project involves extension of public sewer service to residential properties located on Padaro Lane. Approximately 4,100 linear feet of 8-inch diameter polyvinyl chloride (PVC) sewer pipe and 12 maintenance holes would be constructed within Padaro Lane. The new pipeline would begin at an existing District manhole just east of Garrapata Creek and terminate at a point adjacent to 2781 Padaro Lane. The alignment would deviate from the paved area only at the point where the pipe crosses Toro Canyon Creek, at which point it would be attached to the north side of the concrete bridge structure. The project also involves construction of 4-inch diameter PVC lateral sewers and appurtenant cleanout structures, also within the Padaro Lane right-of-way. Annexation of 21 discrete parcels (72 acres) within the project area into the Carpentaria Sanitary District.",https://ceqanet.opr.ca.gov/2013071001,West Padaro Lane Main Sewer Extension,Craig Murray,Carpinteria Sanitary District,N/A,,5300 Sixth Street,,Carpinteria,CA,93013,8056847214,34°24'55"N 119°33'36"W,Carpinteria,Santa Barbara,,Padaro Lane / Beach Club Road,93013,,,Hwy 101,"Pacific Ocean, Toro Canyon Creek, Arroyo Paredon",,Yes,7/1/2013,7/30/2013,Other,Coastal Permit,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Coastal Zone, Cultural Resources, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Public Services, Recreation, Sewer Capacity, Transportation",,,,,,,,,,,,,,,,,