SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2013051094,Monterey One Water,Monterey One Water,,Addendum to the Supplemental Environmental Impact Report for the Expanded Pure Water Monterey Groundwater Replenishment Project,ADM,11/15/2021,,"The Addendum reviewed the potential impacts in the topical subjects listed above related to the Deep Injection Well #6 Changes to the Exp. PWM/GWR Project (proposed changes). The following minor changes to the Exp. PWM/GWR Project are proposed and referred to as the “proposed Deep Injection Well #6 Changes” and have been evaluated in an Addendum: 1) relocation of an Approved Injection Well from one site to another; 2) extension of the product water conveyance pipeline within an existing unpaved roadway; and 3) relocation of an approved backflush basin. The Addendum concludes that there were: (1) no substantial changes to the project requiring major revisions to the EIR because of new or substantially increased significant environmental effects; (2) no substantial changes in circumstances requiring major revisions to the EIR because of new or substantially increased significant environmental effects; and (3) no new, previously unknown or unknowable, information of substantial importance showing: (a) new or substantially more severe significant efforts than were discussed or shown in the EIR; (b) that previously infeasible mitigation measures/alternatives are now feasible and would substantially reduce significant efforts; or (c) that considerably different mitigation measures than analyzed in the EIR would substantially reduce significant effects.",https://ceqanet.opr.ca.gov/2013051094/19,Addendum to the Supplemental Environmental Impact Report for the Expanded Pure Water Monterey Groundwater Replenishment Project,Alison Imamura,Monterey One Water,N/A,alison@my1water.org,5 Harris Court Bldg D,,Monterey,CA,93940,8318836176,36°37'1.1"N 121°48'54.5"W,Seaside,Monterey,,Eucalyptus Rd and General Jim Moore Boulevard,93955,20,"031-211-001-000, 031-151-062-000",Highways 1 and 68,None,Monterey,No,11/15/2021,11/29/2021,Water Facilities,Site Plan,"Aesthetics, Air Quality, Biological Resources, Cultural Resources, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Public Services, Utilities/Service Systems, Vegetation",,,,,,,,,,,,,,,,,