SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2013042075,East Bay Municipal Utility District,,EBMUD,Chabot Dam Seismic Upgrade Project,NOP,4/25/2013,,"The proposed project involves improving the Chabot Dam embankment toe through conventional earthwork or cement deep soil mixing (CDSM). The outlet works would be improved by re-lining the vertical brick-lined shaft that connects the sluice gate control to the outlet pipes, moving the valves and controls from the existing tower to the vertical shaft, relining or installing new outlet pipes from the vertical shaft to the reservoir, filling the tower with low strength flowable fill, retrofitting the tower walls, and removing the pavilion. Excavated materials would be stockpiled at the Filter Pond Stockpile and/or Park Stockpile, which are located at the former filter ponds and Chabot Park, respectively. Two potential haul routes are proposed within the project site: Upper Haul Route and the Lower Haul Route. Following the Chabot Dam seismic upgrade activities, the footprint of the project area would be returned to existing conditions.",https://ceqanet.opr.ca.gov/2013042075,Chabot Dam Seismic Upgrade Project,Gwen Alie,East Bay Municipal Utility District,N/A,,"375 Eleventh Street, MS 701",,Oakland,CA,94607-4240,5102871053,37°43'44"N 122°7'22"W,"Oakland, San Leandro",Alameda,,"Estudillo Avenue, San Leandro",94605,96,Various,I-580,San Leandro Creek,,No,4/26/2013,5/28/2013,"Other, Water Facilities",,"Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Public Services, Transportation, Vegetation, Wetland/Riparian",,,,,,,,,,,,,,,,,