SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2013011044,"La Caņada Flintridge, City of",City of La Caņada Flintridge ,,Flintridge Sacred Heart Academy Specific Plan,NOP,1/28/2013,,"Flintridge Sacred Heart Academy (""FSHA"") is an all girls Catholic, independent high school funded by the Dominican Sisters of Mission San Jose in 1931. The school's original 1927 mission style building was designed as a resort hotel by noted Southern California architect, Myron Hunt. Additional buildings added to the FSHA campus after 1931 were not designed by Myron Hunt. FSHA proposes a Master Plan to complete the process that was started in the early 1990's to renovate campus. In 1994, FSHA obtained a Conditional Use Permit (CUP) that included a student enrollment cap of 385, and approved new structures, including a Student Activities Center and soccer/softball field (completed in 1998), a major renovation of the theatre building to replace the existing 1956 auditorium and an upgrade of the existing high school classroom building. The theatre and high school projects approved in the 1994 CUP have not been constructed. It is the intent of FSHA Master Plan to complete the unfinished projects, upgrade existing facilities, and increase the enrollment cap to more accurately reflect FSHA's capacity. ",https://ceqanet.opr.ca.gov/2013011044,Flintridge Sacred Heart Academy Specific Plan,Fred Buss,City of La Canada Flintridge,N/A,,1327 Foothill Boulevard,,La Canada Flintridge,CA,91011-2137,8187908881,,La Canada-Flintridge,Los Angeles,,,,,,,,,Yes,1/28/2013,2/26/2013,,,"Aesthetics, Air Quality, Cultural Resources, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Public Services, Transportation",,,,,,,,,,,,,,,,,