SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2013011011,"Public Utilities Commission, California",California Public Utilities Commission,CPUC,South Orange County Reliability Enhancement (SOCRE) Project (San Diego Gas & Electric Company),EIR,8/10/2015,,"The SOCRE project would include: 1. Rebuilding and upgrading the existing 138/12-kV air-insulated Capistrano Substation (2 acres) as a 230/138/12-kV gas-insulated substation (6.4 acres); 2. Replacing a segment of a single-circuit 138-kV transmission line between the Talega and Capistrano substations with a new double-circuit 230-kV transmission line (7.5 miles), and relocating several transmission and distribution line segments (2 miles, combined) located near the two substations; and 3. Relocating a 12-kV distribution line into new and existing underground conduit and overhead on new structures form the proposed San Juan Capistrano Substation to Prima Deschecha Landfill. Project construction is anticipated to begin November 2013 and would take about 4 years. ",https://ceqanet.opr.ca.gov/2013011011/3,South Orange County Reliability Enhancement (SOCRE) Project,Andrew Barnsdale,California Public Utilities Commission,N/A,,505 Van Ness Avenue,,San Francisco,CA,94102-3298,4157033221,33°30'44"N 117°39'55"W,"San Clemente, San Juan Capistrano","Orange, San Diego",,"Camino Capistrano, Cristianitos Rd",Various,21 (permanent),Multiple,"I-5, SR-74, 1, 73",Pacific Ocean,No,Yes,8/10/2015,9/23/2015,Power,,"Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,