SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2012128010,Energy Commission,California Energy Commission,,Wind Firming Energy Farm,NOE,12/3/2012,12/3/2012,"Primus Power Corporation will work with DOE, Sandia National Labs, Pacific Gas and Electric Company (PG&E), and Modesto Irrigation District to develop, filed test, and install and monitor a 25 MW/75 MWh grid-connected energy storage system. The project will be conducted in three Phases. Phase 1 will provide a project plan, environmental compliance review, and detailed product definition. Phase 2 will include validation of technology performance, final product design and functionality testing at PG&E's Modular Generation Test Facility, and installation at a utility substation. Phase 3 will quantify the economic and environmental benefits of the deployed EnergyFarm and document field reliability. Specific goals and objectives of the project include: 1) Develop, integrate, and field demonstrate Zinc-based flow battery storage system 2) Provide a low-cost system with a footprint consistent with or smaller than competing technologies. 3) Demonstrate primary and secondary applications including: renewable firming, strategic local peak shaving, automated load shifting, ancillary services.",https://ceqanet.opr.ca.gov/2012128010,Wind Firming Energy Farm,Johann Karkheck,California Energy Commission,N/A,,"1516 Ninth Street, MS-48",,Sacramento,CA,95814,9163272457,,Modesto,Stanislaus,,,,,,,,,,,,,,,,,Categorical Exemption,15301 - Class 1,"Operation, repair, maintenance, or minor alteration of existing structures or facilities not expanding existing use.",,,,,,,,,,,,