SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2012122023,"Yreka, City of",City of Yreka,,Yreka Creek Trail Development Project,MND,12/12/2012,,"The proposed project includes the development of public access trails along Yreka Creek and within the Yreka Creek Greenway, as well as the installation of recreation facilities to include fixed and breakaway bridges, picnic tables, a trailhead parking facility, removal of floodplain constrictions, removal of noxious weeds, a and planting of native riparian and upland vegetation. In particular the Yreka Creek Trial Development Project proposes the following improvements: 1. Construction of approximately 5,000 square feet of asphalt parking lot at the Oberlin Road trailhead; 2. Surfacing of approximately 1,500 linear feet of existing trail to make it ADA-accessible; 3. Construction of approximately 1,900 linear feet of gravel trail; 4. Installation of 2 free-span bridges having approximately 100 linear feet of total length, including abutments and armoring; 5. Installation of up to seven ""float-aside"" seasonal water crossings or upland channel crossings, including abutments and armoring; 6. Installation of armored dip crossings along with two temporary seasonal wet crossings for construction purposes and three in-channel ""Rosgen-venin"" hydraulic features; 7. Installation of armored concrete dip and armored box culverts across overflow channel. 8. Installation of concrete, handicapped-accessible picnic tables and trash receptacles; 9. Creation of approximately 700-foot drainage swale that provides vegetative filtration of storm water; 10. Restoration of approximately 1 acre of floodplain by re-contouring flood constrictions, planting approximately 600 native plants and trees, and implementing erosion control measures; and 11. Development and installation of a bond acknowledgement sign, a trail and site identification map/sign, a chain-link fence along west side of Young property, and trailside interpretive signs and a trailhead drinking fountain. ",https://ceqanet.opr.ca.gov/2012122023,Yreka Creek Trail Development Project,Jeannette Hook,City of Yreka,N/A,,701 Fourth Street,,Yreka,CA,96097,5308412386,41°43'.65"N 122°38'14.49"W,Yreka,Siskiyou,,220 E. Oberlin Road,96097,20,"061-301-030, 050, -070, -080, -420 & -460: 061-352-020, & 190; &, 061-221-070",Hwy 3 & 263,Yreka Creek,,Yes,12/12/2012,1/10/2013,"Other, Recreational",Site Plan,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,