SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2012122018,"Marysville, City of",City of Marysville,,Addendum No. 1 to the Marysville Wastewater Treatment Compliance ,NOD,12/23/2020,12/23/2020,"NOD for the Yuba River Crossing amendments analyzed in this Addendum include constructing a new, temporary, 18-inch HDPE pipe that will connect the WWTP to the existing 24-inch diameter pipe which crosses underneath the Yuba River. The new, temporary, 18-inch HDPE pipe will begin at the WWTP, follow the landside of the levee in a westerly direction, cross over the levee just north of the Western Pacific railroad tracks, follow the railroad abutment south to Biz Johnson Drive, turn in a southerly direction and cross under the railroad tracks, cross under Biz Johnson Drive south of the railroad tracks, then travel north back under the railroad tracks to the existing 24-inch diameter pipe crossing underneath the Yuba River. The wastewater conveyance pipeline will be installed within Biz Johnson Drive using cut and cover techniques. The total length of temporary pipeline to be installed is approximately 543 linear feet.",https://ceqanet.opr.ca.gov/2012122018/11,Addendum No. 1 to the Marysville Wastewater Treatment Compliance ,Craig Platt,City of Marysville,N/A,cplatt@marysville.ca.us,526 C Street,,Marysville,CA,95901,5307493901,,Marysville,Yuba,,Riverside Drive/Sycamore Avenue/Myma Avenue,,,,"70, 99","Feather River, Yuba River","Sutter Co. Airport, Yuba Co. Air",,,,,,,,,,,,City of Marysville,Yes,4/19/2016,No,No,No,Addendum to IS/MND,,,,,City of Marysville