SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2012114001,"Customs and Border Protection, United States","United States Department of Homeland Security, Customs and Border Protection",CBP,West Desert Road Project,JD ,11/15/2012,,"Note: EA / FONSI The Proposed Action comprises improvement of an existing border road and construction of a new access road to the top of BP Hill RVSS tower. The border road improvements would occur from near Border Monument 224 to near Border Monument 225. The border road would be improved to an all-weather surface road (1.4 miles long) approximately 20 feet wide with 2-foot shoulders and would include any necessary drainage structures (i.e., culverts, low-water crossing, or bridge). A drag road would also be constructed along the north side of the all-weather surface. Staging areas would be located approximately every 0.3 mile within the construction corridor. In addition to the 1.4 miles of road improvement, a new access road (approximately 0.2 mile) leading to the BP Hill RVSS tower from the improved border road would be constructed.",https://ceqanet.opr.ca.gov/2012114001,West Desert Road Project,John Petrilla,U.S. Customs and Border Protection,N/A,,"24000 Avila Road, Suite 5020",,Laguna Niguel,CA,92677,9493602382,32°38'57.95"N 115°42'29.11"W,Calexico,Imperial,,SR 98 and Signal Road,92231,7.5,Mount Signal Quadrangle,SR 98,All-American Canal,,Yes,11/15/2012,12/14/2012,Transportation,,"Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Public Services, Solid Waste, Transportation, Vegetation, Wetland/Riparian",,,,,,,,,,,,,,,,,